Differences between revisions 1 and 2
Revision 1 as of 2017-08-14 16:49:39
Size: 577
Comment:
Revision 2 as of 2017-08-14 16:50:21
Size: 568
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
Id
Line 3: Line 3:
    I15 lane closure MP 365-372, hopefully finished by Friday  . I15 lane closure MP 365-372, hopefully finished by Friday
Line 8: Line 8:
    construction hell, apoceclipse  . construction hell, apoceclipse
Line 11: Line 11:
    some bridge damage just after the junction, slow a bit  . some bridge damage just after the junction, slow a bit
Line 14: Line 14:
    no construction, there is I84 construction west of the junction
0
 . no construction, there is I84 construction west of the junction

http://udottraffic.utah.gov/construction.aspx?tab=0 (lane closure tab)

  • I15 lane closure MP 365-372, hopefully finished by Friday

http://mb.511.idaho.gov/ID3g/cameralist.jsp?num=I15

I15: http://mb.511.idaho.gov/ID3g/routereport.jsp?pk=1&allSectionSelected=true

  • construction hell, apoceclipse

I86: http://mb.511.idaho.gov/ID3g/routereport.jsp?pk=5

  • some bridge damage just after the junction, slow a bit

I84 from I15 to I86: http://mb.511.idaho.gov/ID3g/routereport.jsp?pk=3

  • no construction, there is I84 construction west of the junction

Id (last edited 2017-08-14 16:50:21 by KeithLofstrom)