⇤ ← Revision 1 as of 2017-08-14 16:49:39
Size: 577
Comment:
|
← Revision 2 as of 2017-08-14 16:50:21 ⇥
Size: 568
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
Id | |
Line 3: | Line 3: |
I15 lane closure MP 365-372, hopefully finished by Friday | . I15 lane closure MP 365-372, hopefully finished by Friday |
Line 8: | Line 8: |
construction hell, apoceclipse | . construction hell, apoceclipse |
Line 11: | Line 11: |
some bridge damage just after the junction, slow a bit | . some bridge damage just after the junction, slow a bit |
Line 14: | Line 14: |
no construction, there is I84 construction west of the junction 0 |
. no construction, there is I84 construction west of the junction |
http://udottraffic.utah.gov/construction.aspx?tab=0 (lane closure tab)
- I15 lane closure MP 365-372, hopefully finished by Friday
http://mb.511.idaho.gov/ID3g/cameralist.jsp?num=I15
I15: http://mb.511.idaho.gov/ID3g/routereport.jsp?pk=1&allSectionSelected=true
- construction hell, apoceclipse
I86: http://mb.511.idaho.gov/ID3g/routereport.jsp?pk=5
- some bridge damage just after the junction, slow a bit
I84 from I15 to I86: http://mb.511.idaho.gov/ID3g/routereport.jsp?pk=3
- no construction, there is I84 construction west of the junction