||<-2> [[ attachment:IMG_0178.JPG | {{ attachment:IMG_0178.JPG | | height=256 }} ]] ||<-2> foo || | ||<-2> [[ attachment:IMG_0178.JPG | {{ attachment:IMG_0178.JPG | | height=256 }} ]] ||<-2> Electrical and airconditioning pipe/duct after reinstallation. Old siding above (painted ugly pink, new primed-but-unpainted siding below. New Ply-Gem bathroom window in the upper right corner<P>The air conditioner probably uses older no-longer-legal coolant; when that fails, we will replace it and the gas furnace with an electrically-powered heat pump.|| |
Line 12: | Line 12: |
||<-3> [[ attachment:IMG_0181.JPG | {{ attachment:IMG_0181.JPG | | height=512 }} ]] || <-2> foo || | ||<-3> [[ attachment:IMG_0181.JPG | {{ attachment:IMG_0181.JPG | | height=512 }} ]] ||<-2> foo || |
New Siding
Comprehensive Construction replaced the old vertical siding on our south and east basement walls with cedar lap siding to match the upper floor. Siding work completed 2021/November, we will paint in the spring.
New Siding Electrical
We unscrewed (but left connected) the wiring to the air conditioner, the radon pump, and the outside electrical receptical, so it could be reattached to the new siding. Pictures and explanations below, click on pictures for larger image.
Electrical and airconditioning pipe/duct after reinstallation. Old siding above (painted ugly pink, new primed-but-unpainted siding below. New Ply-Gem bathroom window in the upper right corner<P>The air conditioner probably uses older no-longer-legal coolant; when that fails, we will replace it and the gas furnace with an electrically-powered heat pump. |
||||