Differences between revisions 14 and 15
Revision 14 as of 2021-11-25 23:01:00
Size: 1880
Comment:
Revision 15 as of 2021-11-25 23:01:20
Size: 1268
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:

---- /!\ '''Edit conflict - other version:''' ----
||<-2> [[ attachment:IMG_0178.JPG | {{ attachment:IMG_0178.JPG | | height=256 }} ]] ||<-2> Electrical and airconditioning pipe/duct after reinstallation. Old siding above (painted ugly pink, new primed-but-unpainted siding below. New Ply-Gem bathroom window in the upper right corner<<BR>><<BR>>The air conditioner probably uses older no-longer-legal coolant; when that fails, we will replace it and the gas furnace with an electrically-powered heat pump.||

---- /!\ '''Edit conflict - your version:''' ----
Line 16: Line 11:

---- /!\ '''End of edit conflict''' ----

New Siding

Comprehensive Construction replaced the old vertical siding on our south and east basement walls with cedar lap siding to match the upper floor. Siding work completed 2021/November, we will paint in the spring.

New Siding Electrical

We unscrewed (but left connected) the wiring to the air conditioner, the radon pump, and the outside electrical receptical, so it could be reattached to the new siding. Pictures and explanations below, click on pictures for larger image.

attachment:IMG_0178.JPG

Electrical and air-conditioning pipe/duct after reinstallation. Old siding above (painted ugly pink, new primed-but-unpainted siding below. New Ply-Gem bathroom window in the upper right corner

The air conditioner probably uses older no-longer-legal coolant; when that fails, we will replace it and the gas furnace with an electrically-powered heat pump.