Size: 1276
Comment:
|
Size: 1277
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 9: | Line 9: |
||<-2> [[ attachment:IMG_0178.JPG | {{ attachment:IMG_0178.JPG | | height=256 }} ]] ||<-2> Electrical and air-conditioning pipe/duct after reinstallation. Old siding above (painted ugly pink, new primed-but-unpainted siding below. New Ply-Gem bathroom window in the upper right corner<<BR>><<BR>>The old air conditioner probably uses older no-longer-legal Freon coolant; when that fails, we will replace it and the gas furnace with an electrically-powered heat pump.|| | ||<-2> [[ attachment:IMG_0178.JPG | {{ attachment:IMG_0178.JPG | | height=256 }} ]] ||<-2> Electrical and air-conditioning pipe/duct after reinstallation. Old siding above (painted ugly pink), new primed-but-unpainted siding below. New Ply-Gem bathroom window in the upper right corner<<BR>><<BR>>The old air conditioner probably uses older no-longer-legal Freon coolant; when that fails, we will replace it and the gas furnace with an electrically-powered heat pump.|| |
New Siding
Comprehensive Construction replaced the old vertical siding on our south and east basement walls with cedar lap siding to match the upper floor. Siding work completed 2021/November, we will paint in the spring.
New Siding Electrical
We unscrewed (but left connected) the wiring to the air conditioner, the radon pump, and the outside electrical receptical, so it could be reattached to the new siding. Pictures and explanations below, click on pictures for larger image.
Electrical and air-conditioning pipe/duct after reinstallation. Old siding above (painted ugly pink), new primed-but-unpainted siding below. New Ply-Gem bathroom window in the upper right corner |
||||
foo |
foo |
|||
foo |