New Siding

Comprehensive Construction replaced the old vertical siding on our south and east basement walls with cedar lap siding to match the upper floor. Siding work completed 2021/November, we will paint in the spring.

New Siding Electrical

We unscrewed (but left connected) the wiring to the air conditioner, the radon pump, and the outside electrical receptical, so it could be reattached to the new siding. Pictures and explanations below, click on pictures for larger image.

attachment:IMG_0178.JPG

foo

attachment:IMG_0179.JPG

foo

attachment:IMG_0180.JPG

foo

attachment:IMG_0181.JPG

foo

Close-up

attachment:IMG_0182.JPG

foo