Size: 937
Comment:
|
Size: 1816
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
|| [[ attachment:IMG_0033.JPG | {{ attachment:IMG_0033.JPG | | height=80 }} ]] || adfasf || || [[ attachment:IMG_0034.JPG | {{ attachment:IMG_0034.JPG | | height=80 }} ]] || adfasf || || [[ attachment:IMG_0035.JPG | {{ attachment:IMG_0035.JPG | | height=80 }} ]] || adfasf || || [[ attachment:IMG_0038.JPG | {{ attachment:IMG_0038.JPG | | height=80 }} ]] || adfasf || || [[ attachment:IMG_0039.JPG | {{ attachment:IMG_0039.JPG | | height=80 }} ]] || adfasf || || [[ attachment:IMG_0040.JPG | {{ attachment:IMG_0040.JPG | | height=80 }} ]] || adfasf || || [[ attachment:IMG_0041.JPG | {{ attachment:IMG_0041.JPG | | height=80 }} ]] || adfasf || || [[ attachment:IMG_0042.JPG | {{ attachment:IMG_0042.JPG | | height=80 }} ]] || adfasf || |
|| [[ attachment:IMG_0033.JPG | {{ attachment:IMG_0033.JPG | | height=75 }} ]] || The dirt pile with dirt and pea gravel from the hole. I can filter out the pea gravel before thursday with some advanced notice. || || [[ attachment:IMG_0034.JPG | {{ attachment:IMG_0034.JPG | | height=75 }} ]] || The boards on the ground cover the hole that I dug ... which is still there. Besides that, nothing else near the working area, which is accessible via a grass driveway to the street. || || [[ attachment:IMG_0035.JPG | {{ attachment:IMG_0035.JPG | | height=75 }} ]] || Close up of the power connection. The radon pump power will be through the 0.825 flexible plastic conduit (which needs cutting to length) with a #10 grounded 120V cable running through it. I guessed and put a 0.75 inch coupler on the end, but that can be changed. Power connects through a switch in a weather-resistant enclosure to a 20A weather resistant GFCI outlet, fed through a dedicated cable from a 20A AFCI breaker in the load center. You can see a (powered) 3 prong receptacle tester inside the clear cover. <<BR>><<BR>>This has not been inspected by the county yet; I will get that done when you finish, and when I finish another added branch for another purpose. || || [[ attachment:IMG_0038.JPG | {{ attachment:IMG_0038.JPG | | height=75 }} ]] || adfasf || || [[ attachment:IMG_0039.JPG | {{ attachment:IMG_0039.JPG | | height=75 }} ]] || adfasf || || [[ attachment:IMG_0040.JPG | {{ attachment:IMG_0040.JPG | | height=75 }} ]] || adfasf || || [[ attachment:IMG_004A.JPG | {{ attachment:IMG_004A.JPG | | height=75 }} ]] || adfasf || |
Preparing for Radon Mitigation
Cascade Radon, 20 January 23
Pictures of where the Radon Pump Will Go
Click Picture for Larger Image or Download
The dirt pile with dirt and pea gravel from the hole. I can filter out the pea gravel before thursday with some advanced notice. |
|
The boards on the ground cover the hole that I dug ... which is still there. Besides that, nothing else near the working area, which is accessible via a grass driveway to the street. |
|
Close up of the power connection. The radon pump power will be through the 0.825 flexible plastic conduit (which needs cutting to length) with a #10 grounded 120V cable running through it. I guessed and put a 0.75 inch coupler on the end, but that can be changed. Power connects through a switch in a weather-resistant enclosure to a 20A weather resistant GFCI outlet, fed through a dedicated cable from a 20A AFCI breaker in the load center. You can see a (powered) 3 prong receptacle tester inside the clear cover. |
|
adfasf |
|
adfasf |
|
adfasf |
|
adfasf |